scsorba@telus.net | copyright © 2011 steven csorba. all rights reserved
Cost Allocation: Estimate
6 – 8 months of painting / production time
Studio assistant
Technology Hardware
Ap development
Traditional painting supplies
Canvas and frame supports
Light box construction (10 boxes)
Printing Supplies; Pigments/ support media
Documentation
-photography
-writing
-printing catalogs
Studio Assembly Space
(larger pieces - two months of space needed)
Shipping
Assembly and Installation costs
Rental of artshow space
Total
Technology Sponsors
Platinum, Gold, Silver Sponsors
Cultural Sponsors, Grants, etc
Patrons of the Arts
40,000
10,000
5,000
3,500
7,500
7,500
5,000
5,000
5,000
2,000
1,000
5,000
5,000
$ 101,500